Project Role
Project Job Captain
- Developed design principal’s concept and initiated multiple design alternatives.
- MEP, Structural coordination lead
- Revit and BIM coordination lead
Technology
This project was the first school project to be fully designed, coordinated and delivered in Revit by LS3P and their consultants. I was the leader in coordinating drawings and model exchanges between architecture, interiors and our consultants. This project utilizes many parametric design features that helped us maintain proportional and unified design statement.